Information Forum and FAQ

Does France need more nuclear power?

Since the 1960s, France has chosen to develop a large-scale nuclear power fleet and is now embarking on its renewal through the EPR2 programme. This strategy has enabled France to benefit from an abundant supply of affordable, low-carbon electricity.However, the nuclear power fleet alone cannot meet all of the country's decarbonisation needs.With its SMRs, Jimmy addresses industrial heat requirements that cannot be met by the existing nuclear power fleet.

By building on proven technologies and the strength of France's nuclear industry, Jimmy contributes to the decarbonisation of industrial operations.
‍

Do you generate electricity?

Jimmy's SMR has been designed to produce heat. However, by adding a turbine, we can also generate electricity for customers interested in cogeneration (the combined production of heat and electricity).
‍

When will your first generator be operational?

Our ambition is to have our first reactor operational in the early 2030s.
‍

What about nuclear safety?

Safety is our top priority. Every stage of our projects is reviewed, monitored, and approved by the ASNR (French Nuclear Safety and Radiation Protection Authority).
We work closely with its teams, as well as with the local authorities in the areas where our projects are being developed.Safety is not a constraint; it is our most valuable asset when developing a nuclear project. There can be no compromise when it comes to nuclear safety.

Our projects are currently being developed within the French regulatory framework, one of the most stringent in the world. Under this framework, the ASNR reviews and assesses every detail of our generator with the same level of rigour applied to an EPR reactor.
‍

What about nuclear waste?

Jimmy's nuclear waste can be managed through France's existing waste management systems.In the short term, we will rely on existing solutions and infrastructure for nuclear waste storage. TRISO fuel particles will be stored in small containers in dry storage facilities before being vitrified and transferred to deep geological disposal facilities used by the French nuclear industry.

In the longer term, we are exploring the possibility of reprocessing these TRISO particles to maximise resource efficiency.We are working with the French National Agency for Radioactive Waste Management (ANDRA), which manages more than 90% of the radioactive waste produced in France each year.
‍